For the rest of 2025, BYO+ Gift Subscriptions are 50% off! Click here to order.

mr-wizard

Delayed Yeast Pitching

Q: I would like to brew two separate beers and have them on the same lagering schedule, as I only have one temperature controlled freezer box. Because of time constraints and some other problems, it is impossible to brew both batches on the same day. Is it alright to brew a batch and let it sit a day without pitching the yeast? My plan is to brew the second beer the next day and pitch yeast into both at the same time.
— Dave Abendroth • Eureka Springs, Arkansas

A: This is a question deserving a brief answer! I think you are on the right track wanting to have your lager fermentations timed where you can use the same lagering schedule. I strongly discourage you, however, to delay pitching the first batch for an entire day because that is a recipe for a potential bacterial disaster.

Most lagers have three phases to fermentation: primary fermentation, a diacetyl rest and lagering. Let’s assume that primary fermentation takes seven days for both batches at 50 °F (10 °C) and you add another four days at 68 °F (20 °C) for the diacetyl rest before chilling the beers to 32 °F (0 °C) for lagering. It will not hurt the first batch at all if you simply extend the diacetyl rest to five days so that both beers are chilled at the same time. This scheme will solve your timing problems and eliminate the big no-no of delaying yeast pitching. Happy lagering!

You might also like…

Orange question mark over a beer Mr. Wizard logo. mr-wizard

What is hopbursting?

Orange question mark over a beer Mr. Wizard logo. mr-wizard

Measuring/Hitting FG

Orange question mark over a beer Mr. Wizard logo. mr-wizard

Adding water to carboys after racking

Orange question mark over a beer Mr. Wizard logo. mr-wizard

Pre-Boil vs. Post-Boil Water Ion Concentrations